Tarmac resurfacing Bournemouth airport runway | Avon Material Supplies
September 7, 2016 admin

Tarmac resurfacing at Bournemouth airport

Avon Material Supplies have been working at Bournemouth International Airport, resurfacing one of the runways.

Our works were conducted overnight in order to cause as little disruption as possible to the running of the airport.

The tarmac planings have been collected by our tipper trucks and transported to a site compound.